Solar PV > Step by step installation
Step by step installation
Technical Survey: Our technical survey team will visit you for around 40 minutes to accurately measure and assess the site for the solar PV installation.
arrow
Scaffolding: Scaffolding goes up normally a day or two before the installation.
arrow
Mounting Kit: Our installers start by securing the mounting kit to the rafters of your roof. We only use quality engineered mounting systems that have been tested for wind and snow loading in the UK.
arrow
PV Panel installation: Once the mounting kit is secured, the panels clip into place quickly and easily.
arrow
Electrical connection: Our electrician connects the system to the main consumer unit (fuse box) in your home and tests the system.
arrow
Completion: After a thorough set of checks, the system is switched on and handed over.
arrow
Application for tariff payments: Once you have our compliance certificate, you need to apply to receive the FIT payments. This requires you to fill out a simple form which you should obtain from existing energy supplier.

The install team can generally complete all of their work in one day. In the odd case where this is not possible, the installation will be completed the following morning.